summit website logo
  • Home
  • About us
  • Our work
    • Briquettes production
    • Food Waste Recycling
    • Paver making
    • Fish farming
    • Smart agriculture
  • Trainings
  • Videos
  • Facebook
  • https://twitter.com/SummitGreen_Co
  • https://www.youtube.com/channel/UCngAHY5FxKLe-KZVHHEoEXA
  • The pavers are laid to dry
  • Water is added in the cement-water mixture
  • The silt is nixed with cement and water
  • silt is sieved for finer particles
  • Drainage channel where the silt is collected
  • Smart-agriculture
  • Cat Fish harvesting
  • summit-green-company-training
  • St Kizito High school pond construction 2022
  • St Kizito High school pond construction 2022
  • pond construction 2021
  • pond construction by summit green company
  • summit community training
  • Briquettes training
Demonstration of small space poultry farming
Ornamental gradening
Waste to wealth show room
Demonstrating us of Institutional stoves
uground garden for mushrooms and onions
IMG_3190
IMG_2931
IMG_2984
IMG_3000
IMG_3026
IMG_3073
IMG_3117
IMG_3133
IMG_3201
stage-5
stage-4
stage-0
stage-3
stage-2

◄ 1 2

Location

Summit Green Company LTD is located long Bombo Road 500 meters from Kobil Petro Station-Matuga Kito P.O.BOX 149447 Kampala, Uganda

Pages

  • About Us
  • Videos
  • Trainings

Services

  • Briquettes production
  • Paver Making
  • Smart Agriculture
  • Fish Farming

Contact Us

info@summitgreencompany.com

(+256) 751 870195​ / 785 604122​

FG9G+QM9, Matugga

Copyright © 2022 Summit Green Company All rights reserved.

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram